	Sceilg Mhichíl Works Report 2023
Posted on 25 January 2024
The Sceilg Mhichíl Works Report outlines the repair works completed on the World Heritage Property in 2023.
Note: Appendix F – Emergency Exercise Irish Coast Guard Rescue Simulation Minutes has been omitted for GDPR concerns and Appendix E – Summary of the Attributes for Ireland’s two existing World Heritage Properties can be accessed here.
- 
							
							
 Download the Sceilg Mhichíl Works Report 2023
- 
							
							
 Download Appendix A - Method Statement for Archaeological Monitoring of repair of part of Upper Lighthouse Roadway wall
- 
							
							
 Download Appendix B - Method Statement for Archaeological Monitoring of Conservation of Upper Lighthouse Terrace Wall
- 
							
							
 Download Appendix C - Additional Method Statement for Archaeological Monitoring of Conservation of Upper Lighthouse Terrace Wall
- 
							
							
 Download Appendix D - Archaeological Monitoring of Conservation of Upper Lighthouse Terrace Wall
- 
							
							
 Download Appendix G - Sceilg Mhichíl 2023 OPW Maintenance Plan
- 
							
							
 Download Appendix H - Sceilg Mhichíl Climatee Vulnerability Assessment Technical Experts Workshop
- 
							
							
 Download Appendix I - NIS Proposed Sea Wall Repairs on the Lighthouse Road, Skellig Michael
- 
							
							
 Download Appendix J - NIS Proposed Installation of Cable Stays on the Crash Decks at Skellig Michael
- 
							
							
 Download Appendix K - NIS Proposed Inspection and Safety Sweep of the Island for Loose Rock Material
- 
							
							
 Download Appendix L - UCC Atlantic Puffin Tagging Report 2023